Connecting the Power Cords and Powering On the 2 Gb TP9100 Rack
007-4522-003 43
Warning: The rack PDUs must be connected only to power sources that have a
safe electrical earth connection. For safety reasons this earth connection must be
in place at all times.
Be careful not to touch the pins on the PDU plug when you insert it into a power
source.
4. Press the rack breaker switch at the bottom of each PDU so that the word
ON shows.
5. Ensure that all of the socket group breakers on each PDU are turned on (position
I”=on, “O”=off). These breakers are identified by illuminated green buttons.
6. Move the power switch on the rear of each PSU/cooling module (2 per enclosure) to
the “On” position (position “
I”=on, “O”=off).
Checking AC Power and System Status for the Rack
When you power on the system, the “Power on” LED on each ESI/ops panel (see
Figure 2-4) in each enclosure you are operating should illuminate. If it does not, check
that the power supply/cooling modules in the enclosure are correctly cabled to the rack
PDUs and turned on.